Fairfax Upper Level Remodel

This upper level had huge potential and did not disappoint. Both bathrooms upstairs were remodeled along with new hardwood flooring, carpet runners, lighting, door hardware and relocating the attic access. For the primary bathroom, the initial layout had two vanities that were in different rooms with a long hallway leading towards the shower area. We tapped into this unused floor space to expand the footprint of the primary bath. This allowed for the entrance into the walk-in closet to now be accessible from within the bathroom. Some of our favorite aspects were the rough sawn poplar wood accent wall, new Andersen casement windows, shiplap on the ceiling and trough sink with dual faucets resting on a character maple double vanity. The hall bathroom gave more elbow room to two siblings and increased the amount of storage within the bathroom by consuming a small linen closet in the hallway. You may be thinking we’re crazy for suggesting to take away a linen closet ; fear not, we added a linen closet with a custom dog crate underneath within the primary bedroom. Now, those adorable pups have their own spot.

Posted in